Our Lady of Lourdes

Our Lady of Lourdes and the Catholic Diocese of St. Petersburg hired C&K Architects | Interiors, Inc. to renovate the interior of the sanctuary the firm originally designed in 1975. The original nave, chancel and narthex have not been changed since new in 1975. Consequently the furniture and finishes are showing the age and wear of… Continue reading Our Lady of Lourdes

Dunedin Technical Services Building

SouthWest View

C&K Architects | Interiors, Inc. has teamed with Kokolakis Construction recently proposing redevelopment of a vacant Downtown Dunedin parcel of land adjacent to the City’s Municipal Services Building. This proposal will include development of a new Technical Services building for the City as well as approximately 70 new apartments above new retail space. Included will new… Continue reading Dunedin Technical Services Building

Clearwater Grande, Clearwater

CLEARWATER GRANDE RESORT & SPA CLEARWATER BEACH, FLORIDA NEW CONSTRUCTION +800,000 sq. ft. PROJECT CHARACTERISTICS Located within the “Beach by Design” revitalization district on Clearwater Beach, near the Sand Key Bridge, this 10 story, 91 suite beach resort has been designed to provide breath taking views of the Gulf of Mexico and the inter-coastal waterway from every suite. This… Continue reading Clearwater Grande, Clearwater

Published
Categorized as Gallery

Madiera Grande Resort, Madeira Beach

CLIENT / LOCATION Santa Madeira Partners NEW CONSTRUCTION New, 5-story unflagged resort hotel and marina with 88 suites in 3 buildings. 200,000 sq.ft. PROJECT CHARACTERISTICS This project includes a breakfast lounge, service kitchen, business center, a fitness center and 3 in-ground pools. Each suite includes a living room, kitchen, master bedroom and 2 full baths.

Published
Categorized as Gallery

Hyatt Clearwater Resort and Spa, Clearwater Beach

HYATT CLEARWATER RESORT & SPA CLEARWATER, FLORIDA NEW CONSTRUCTION 250 suites: ranging from 510 sq. ft. to 1,200 sq. ft. PROJECT CHARACTERISTICS This resort has been designed to offer a Gulf of Mexico view from every suite allowing their guests to experience beach life at its finest including the beautiful sunsets and white sand beach. As part of… Continue reading Hyatt Clearwater Resort and Spa, Clearwater Beach

Published
Categorized as Gallery

Achieva Corporate Headquarters, Dunedin

The project included renovations and additions to existing buildings that were constructed in 1988, totaling approximately 59,700 GSF. Construction was planned in three phases. Phase I  included the renovation of the existing two story 25,573 G.S.F. building and will house offices and a small data center on the second floor. A new generator will be installed adjacent… Continue reading Achieva Corporate Headquarters, Dunedin

Baypoint Commerce Center, St. Petersburg

Baypoint Commerce Center is located at Gandy Boulevard, between 4th Street North and 9th Street North in St. Petersburg. Originally developed in 1971, the Center is comprised of over 76 acres with 15 office buildings. Maddux NewsWire: St. Petersburg, FL (September 2011) – The Feil Organization recently purchased Baypoint Commerce Center in January 2011 and will begin a multi-million park-wide improvement plan. The first phase will consist of parking lot improvements, landscaping and… Continue reading Baypoint Commerce Center, St. Petersburg

Clear Channel Outdoor, Largo

New Clear Channel Outdoor Tampa Bay Market Office 5555 Ulmerton Road 8731 Gross Square Feet Single Story Tilt Wall Construction Large Missile Impact Storefront and Curtainwall Aluminum Sunshades Replaces a 30+ year old facility with low ceilings that was prone to roof leaks and flooding during rain events

Parking Garage, Winter Haven

C&K Architects | Interiors, Inc. worked with Whitehead Construction as a Design/Build team to produce, for the City of Winter Haven, a new 260 space vehicular parking garage located in the Downtown Core of Winter Haven. The garage is naturally ventilated with three levels of pre-cast concrete supplied by Coreslab Structures. The exterior street front walls… Continue reading Parking Garage, Winter Haven

Published
Categorized as Gallery

Tampa Police Facade, Tampa

C&K Architects | Interiors, Inc. was hired by the City of Tampa to study the exterior envelop for deterioration and recommend repair or replacement options along with design solutions for the appearance. A report was submitted in 2nd quarter 2012 and funding was secured for work on the south façade. A report on the remaining… Continue reading Tampa Police Facade, Tampa

Published
Categorized as Gallery

Dunedin Fine Art Center, Dunedin

CLIENT / LOCATION Dunedin Fine Art Center 1143 Michigan Avenue Dunedin, FL NEW CONSTRUCTION / RENOVATION Galleries, Studios, Gift Shop & Classrooms: 10,000 sqft PROJECT CHARACTERISTICS AIA AWARD WINNER – This public fine arts center facility was originally designed by Collman & Karsky Architects over 25 years ago. In 1998, the trustees turned to us… Continue reading Dunedin Fine Art Center, Dunedin

Published
Categorized as Gallery

Tampa Bay Water, Land O’Lakes

C&K Architects | Interiors, Inc. worked with Tampa Bay Water to design their new Infrastructure and Emergency Management facility in Land-O-Lakes, Fl. The hurricane resistant facility is single story pre-engineered steel structure with masonry walls. The building is 17,000 s.f. of space for offices, data storage and computer systems supporting the water distribution system serving multiple… Continue reading Tampa Bay Water, Land O’Lakes

Published
Categorized as Gallery

83 Park Place

PROJECT CHARACTERISTICS C&K Architects | Interiors, Inc. designed this new multi-tenant corporate office building for Hallmark Development.  This new two-story building is Gold LEED Certified.  The building will function as corporate offices for Brown & Brown Insurance and a GSA tenant. C&K designed the building as an environmentally friendly facility. Fluorescent light fixtures with sensors… Continue reading 83 Park Place

Published
Categorized as Gallery

6|10 Corporation, Winter Haven

Six Ten Corporation Inland Fiber and Data Center – Tier III Architect: C&K Architects | Interiors, Inc. Size: 5,500 SF Data Center Buildout Cost: $3,250,000 Owner: Six Ten Corporation Owner Contact: Bud Strang, (863) 299-1195 Completion Date: 8/2006 Design-Build Contractor/Construction Manager: Florida Telecom Construction Brief Description: Hardened existing third floor building construction to Category IV… Continue reading 6|10 Corporation, Winter Haven

Published
Categorized as Gallery

Creative World Schools

Creative World Schools is a 13,000 SF prototype daycare facility for infants, toddlers and pre-school children age 2 through 5. The facility also houses an afterschool care program called CW Kids Club. The facility contains the following program areas: reception, office, library, food service, 12 classrooms, outdoor age graded playgrounds, plus an Exploratorium. The Exploratorium… Continue reading Creative World Schools

Published
Categorized as Gallery

RRE Office Building, ICOT Center, Largo

C&K worked with RRE/CSC’s construction division to design a unique two story 8,600 s.f. concrete tilt-wall facility for the companies corporate office. The building is located on a triangular parcel of land at the entrance of the Icot Business Center at 58th Street and Ulmerton Rd. in mid-Pinellas county.

Published
Categorized as Gallery

Hayden-Rubin Office

HAYDON-RUBIN NEW CONSTRUCTION Corporate Office Complex 2-story PROJECT CHARACTERISTICS C&K Architects | Interiors, Inc. provided design, construction documents and some construction administration for Haydon Rubin’s new 46,000 SF corporate facility. The 2-story, tiltwall facility provides administrative office space for Haydon Rubin’s headquarters as well as Rubin Real Estate.

Published
Categorized as Gallery

Dunedin Community Center

  CLIENT / LOCATION City of Dunedin 1143 Michigan Avenue NEW CONSTRUCTION Community Center: 55,000 sq. ft. PROJECT CHARACTERISTICS C&K Architects | Interiors, Inc. designed a new LEED registered Community Center to meet the ever-growing needs of the City and the community. C&K evaluated other municipal community center/recreation program philosophies, trends and technologies in addition… Continue reading Dunedin Community Center

Published
Categorized as Gallery

Encore in Tampa

This project is located in the Channelside District of Tampa near the Tampa Bay Times Forum. It has two towers of apartment or hotel units above parking decks with retail at the street level. An amenities deck is planned with indoor multipurpose spaces for meetings, movie theater, exercise and game areas. CLIENT / LOCATION Bank… Continue reading Encore in Tampa

Clearwater Yacht Club

CLEARWATER YACHT CLUB CLEARWATER BEACH, FLORIDA NEW CONSTRUCTION 19,000 sq. ft. PROJECT CHARACTERISTICS This (3) story yacht club, to be located within the “Beach by Design” revitalization district is located on Clearwater Beach along the inter-coastal waterway. Designed to provide the yachting community with a full service restaurant and bar, banquet facilities, full fitness center… Continue reading Clearwater Yacht Club

Published
Categorized as Gallery

Largo Library, Largo Florida

LARGO LIBRARY LARGO, FLORIDA NEW CONSTRUCTION New replacement public library: 90,300 sq. ft. Construction Cost: $15.5M – $2.2M Fee PROJECT CHARACTERISTICS AWARD WINNER- IIDA 2005 Government/Institutional Project Design New Largo Library is a 90,300 square foot facility and is a single story facility except for the collection wing. There is a program/meeting room wing with a coffee shop that… Continue reading Largo Library, Largo Florida

Published
Categorized as Gallery

David Straz Center, Tampa

David A. Straz Jr. Center for the Performing Arts 1010 N. W.C. MacInnes Place Tampa, Florida   NEW CONSTRUCTION/RENOVATION Ticket Box Office and Roof Garden (Ticket Box Office) 1,530 sq. ft. (Addition and Roof Garden) 929 sq. ft.   PROJECT CHARACTERISTICS The project included renovation of the existing ticket box office with an addition of… Continue reading David Straz Center, Tampa

Published
Categorized as Gallery